ETD
ETD什么意思,ETD翻译
基本解释
abbr.: (航班等的)预计离开时间
网络: 开船日;估计出发时间(estimated time of departure);预计开船日期
权威解释
(航班等的)预计离开时间:
estimated time of departure (the time at which an aircraft, ship, etc. is expected to leave)
英汉解释
estimated time of departure 估计的离开时间
预计离开时间
例句
Secure confirmation from supplier and verify cost, quantities and ETD meet requirements for all the orders.
督促供应商按时回签定单,并核实价格数量及交货期等是否满足客户要求。
ETD machines use mass spectrometry technology to detect minute particles of explosive compounds.
ETD用质谱测定技术探测炸药混合物的微小颗粒。
Please send in this format, with sign and stamp, and mention estimated gross weight, volume, and bank details, plus ETD.
请使用此格式,并有签字及印章,预计毛重,体积,银行信息,…
Purchase raw material based on material planning, shall track all raw material ETD to meet production and planning demand.
采购原材料,跟踪所采购材料的到料状况,以满足生产和计划的需求。
Pls advise the ETD, ETA and the name of Vessel.
请通知告知,船名和开航期与预计到达目的港口的日期。
Ferrite cores - Guide on the limits of surface irregularities - Part 3 : ETD- cores and E-cores .
铁氧体磁心。表面不规则性限值指南。第3部分:ETD芯和E芯。
Confirm with agent with information such as carrier name, vessel name, booking no, equipment, ETD, and ETA.
与代理商确认货运信息,如承运人名称、船名称、订单号、船上设备、预计离港日及到港日等。
"Reserved order" fixed volume of specified article, but ETD not yet locked.
“含蓄秩序”指定固定体积的文章,但等没有锁。
ETD Estimated(Expected) Time of Departure
预计离泊时间
d. If material ETD is too late, which will cause a sample delay, find substitute material right away under the approval of customer ;
如果材料交期太晚,可能导致样品出货的耽搁,在客户许可下立刻找替代材料;