红联英语单词
critical path analysis
critical path analysis什么意思,critical path analysis翻译
基本解释
un.: 关键路线分析;关键路径分析;临界通路分析
网络: 统筹分析
英汉解释
临界通路分析
关键路径分析
关键路线分析
例句
Maybe we don"t need continuous critical path analysis, but we still have specialists that are not permanently dedicated to the team.
或许我们不必持续地做关键路径的分析,但是我们仍然有专家并非永久致力于团队。
Hardware architecture and critical path analysis are also introduced.
给出了硬件结构图及关键路径分析。
Explain the strengths and weaknesses of critical path analysis.
解释关键路径分析的优缺点。
What about dependencies and critical path analysis?
依赖和关键路径分析如何去做?
Critical Path Analysis for Structure Optimization of Workflow
面向工作流结构优化的扩展关键路径分析
